Performance References of ELODE

Since 1998, ELODE has provided innovative sludge reduction solutions to various clients, starting with Hyundai Motor Group and extending to other major domestic clients such as Taekwang Group, Donghae Paper, AmorePacific, LG Chem, Kolon Group, Hansol EM, Samsung Electronics, Busan Namgu Sewage Treatment Plant, Lotte Chemical, Korea DuPont, and Songwon Industrial. Internationally, ELODE has been recognized and utilized in countries like the USA, China, Japan, the UK, Hungary, Poland, the Czech Republic, the Netherlands, Singapore, and Taiwan.


Operational results from various industries and clients have objectively demonstrated ELODE's capabilities in optimizing sludge reduction processes. Below is a summary of key client performance results.
 (Refer to the attached Actual Operating Result data for details.)

Key Client Performance Summary
S Client (Semiconductors)
CLASS
BEFORE
AFTER 
Dry Solid Content (DS)
15.40%
42.20%
Daily Cake Volume
No lower than PH3
Possible from PH1~2
Total Annual Cost
Approx. $3.595 million
Approx. $1.775 million
Annual Savings 
Approx. $1.819 million
S Client (Municipal Wastewater)
CLASS
BEFORE
AFTER 
Dry Solid Content (DS)
14.00%
42.20%
Daily Cake Volume
75.00㎥/day
Possible from PH1~2
Total Annual Cost
Approx. $1.864 million
Approx. $937,000
Annual Savings
Approx. $927,000
I Client (Beverages/Alcohol)
CLASS
BEFORE
AFTER 
Dry Solid Content (DS)
16.50%
39.90%
Daily Cake Volume
30.30㎥/day
12.53㎥/day
Total Annual Cost
Approx. $1.346 million
Approx. $662,000
Annual Savings
Approx. $683,000
K Client (PVC Resin)
CLASS
BEFORE
AFTER 
Dry Solid Content (DS)
12.00%
38.80%
Daily Cake Volume
30.30㎥/day
6.70㎥/day
Total Annual Cost
Approx. $1.346 million
Approx. $355,000
Annual Savings
Approx. $991,000 
D Client (PVC Resin)
CLASS
BEFORE
AFTER 
Dry Solid Content (DS)
18.00%
53.00%
Daily Cake Volume
43.56㎥/day
14.79㎥/day
Total Annual Cost
Approx. $866,000
Approx. $395,000
Annual Savings
Approx. $471,000 
mobile background

Conclusion

ELODE has demonstrated significant
impacts on sludge management, including

1. Cost Savings

Annual reductions of hundreds of thousands of dollars.

3. Operational Efficiency 

Higher dry solid content (DS) enhances transport and treatment efficiency. 

2. Volume Reduction 

Daily cake output reduced by over 50% on average. 

4. Environmental Benefits

Reduced sludge volume minimizes waste handling and environmental impact. 

ELODE serves as an effective solution that enhances financial
 and environmental efficiency in sludge management across various industries.

Operation Result for References

Name Of Customer
S Customer
S Customer
I Customer
K Customer
D Customer
Location
SUWON CITY
SUWON CITY
KYUNGNAM PROV.
GIMCHEON CITY
WOOLSAN CITY
OPERATION MODEL * QTY
SELO-3000*3sets 
SELO-3000*2sets
SELO-2000*1set 
BELO-2500*1set
BELO-3500*1set
SLUDGE TYPE
SEMICONDUCTOR
MUNICIPAL
ALCOHOL
PVC RESIN
PAPERMILL
Before ELODE(A)
Model
BELT PRESS
DECANTER
CENTRIFUGES
BELT PRESS
BELT PRESS
Method Of Installation
2nd Stage
2nd Stage
2nd Stage
Replacement
Replacement
Operation Time/Day
22
22242416
Primary Slude Volum/D
1800
7002502600560
Input Sludge WT%
99
98.59899
98.6
SS%1.001.502.001.001.40
DS(%)15.4014.0016.5012.0018.00
CAKE-OUT(㎡)/Day116.8875.0030.3021.6743.56
Price/m³US$ 85US$ 66US$ 120US $96US $55
Dailly CostUS$ 9,935US$ 4,950US$3,636 US$2,080 US $2,396
Yearly Cost ⓐUS$ 3,576,623US$ 1,782,000US$ 1,309,091US$748,800 US$ 862,400
Daily electric consumption792.00kW.h3520.00kW.h1584.00kW.h288.00kW.h192.00kW.h
Electric Cost/kW.h0.0650.0650.0650.0650.065
Daily CostUS$ 51.48US$ 228.80US$ 102.96US$ 18.72US$ 12.48
Yearly Cost ⓑUS$ 18,532.80US$ 82,368.00US$ 37,065.60US$ 6,739.20US$ 4,492.80
Total ⓐ+ⓑ/YearUS$ 3,595,156US$ 1,864,368US$ 1,346,157US $755,539US$ 866,893
Year of InstallationMar-08Jan-08Jun-07Jan-08Jun-07
DS (%)  42.2039.4039.9038.8053.00
CAKE-OUT (m³)/day  42.6526.6512.536.7014.79
Price/m³US$ 85US$ 66US$ 120US $96US $55
Daily CostUS$ 3,625.59US$ 1,758.88US$ 1,503.76US$ 643.30US$ 813.58
Yearly cost ⓐUS$ 1,305,213US$ 633,198 US$ 541,353US$ 231,588US$ 292,891
DC Voltage8080757575
Amp28002600210022002600
Reverse ratio1.361.421.371.331.4
Daily electric consumption20106.24kW.h12995.84kW.h5178.60kW.h5266.80kW.h4368.00kW.h
Electric Cost/kW.h0.0650.0650.0650.0650.065
Daily CostUS$ 1,306.91US$ 844.73US$ 336.61US$ 342.34US$ 283.92
Yearly cost ⓑUS$ 470,486.02US$ 304,102.66US$ 121,179.24US$ 123,243.12US$ 102,211.20
Total ⓐ+ⓑ/YearUS$ 1,775,699US$ 937,301US$ 662,533US$ 354,831US$ 395,102
RESULT / Year
CAKE Volume (A):(B)/(m³)-891-580-213-180-345
Amount Save (A):(B)US$ 1,819,457US$ 927,067 US$ 683,624 US$ 400,708US$ 471,791

Contact


© 2025 BLUEWIN Co., LTD. All Rights Reserved.